- This is by far the most accurate and reliable method of providing an approximate estimating and / or costing for a project .
- This method provides an excellent basis for cost checking durting the detailed design of a project .
- THis method of costing a project assists thedeveloper to know not only the total sum of the project but also the sum per item or elements .
- The sum per item or leelemtns shows from foundations normally called substructures , and structure above ground caled superstructure up to roofing and finishes .
- Composite price rate items are obtained by combining or grouping bill items .
- A brickworks item measured in m2 will normally include all incidental labours and finishes in both wall faces .
-A foor item will include the door frame , architraves , glazing ( if any ) and ironmongery .
- The priced preliminaries must be examined because of the different approaches adopted by the contractors .